The current position:

RESCUE BOATS

release time:2017-07-17 13:07 | effective date:2017-07-17 13:34:58

1. Incorporate the requirements of the factory test equipment in CCS Circular No. 048 into the guide and be included in item 6.2, in concert with the circular.

2. Incorporate CCS Marine Product Management Department (2015) No. 176 “About the drain valve set up in the lifeboat and rescue boat” into the guide, which is included in table 8.1 (1) notes.

3. Incorporate the CCS "Rules for Materials and welding" into item 2.7.

4. Change the "molding technical documents" in the item 4.1 for reference.


L04RESCUE BOATS clean.pdf