The current position:

LIFEBOATS

release time:2017-07-17 13:07

1. Incorporate the requirements of the factory test equipment in CCS Circular No. 048 into the guide and be included in item 6.2, in concert with the circular.

2. Incorporate CCS Marine Product Management Department (2015) No. 176 “About the drain valve set up in the lifeboat and rescue boat” into the guide, which is included in table 8.2 (1) notes.

3. Change the "molding technical documents" in the item 4.1 for reference.


Download link:
L06LIFEBOATS clean.pdf
Note: If you need to reprint, please indicate the source of the information.

Previous: RESCUE BOATS

Next: Pyrotechnic Signal