Circulars Instructions
No. Title Date Memo Download
(2010 )circular No.36, Total No.36  Notice on withdraw UR G3 rev.3& rev.3 Corr.1  2010-06-25    UR G3 (Rev 2 1997)CLN.pdf
Notice on withdraw UR G3 rev.3& rev.3 Corr.1.pdf
 
(2010)Circular No.26, Total No.26  REVISED GUIDELINES ON IMPLEMENTATION OF EFFLUENT STANDARDS AND PERFORMANCE TESTS FOR SEWAGE TREATMENT PLANTS  2010-05-21    CCS (2010)Circular No.26, Total No.26.pdf
 
(2010)Circ. 22/Total No.22  Notice on Implementation of Liquefied gas cargo and process piping Corr.1  2010-05-21    Notice on Implementation of “Liquefied gas cargo and process piping” Corr.1.pdf
 
(2010)Circular No.13, Total No.13  About PressureVacuum Valves and Flame Arrester Approval and Certificate  2010-04-01    About PressureVacuum Valves and Flame Arrester Approval and Certificate.pdf
 
list-20040927  Circulars of Product Management Department of Industrial Division  2004-09-27    list of Circulars 0409027(English).doc
 
CCS Circ. NB No.007  Technical Requirements and Compilation and Approval of the Supplementation to the Loading Manual of the Exiting Bulk Carriers  1999-05-11     
CCS Circ. NB No.006  The Compilation of Evaluation Report and the Requirements of Safety Evaluation of Existing Bulk Carriers  1999-04-01     
CCS Circ. NB No.005  Requirements for Approval of the Scheme of Corrosion Prevention for the Seawater Ballast Tanks of New Tankers and Bulk Carriers  1998-10-21     
CCS Circ. NB No.003  Requirements for Approval and Survey of Loading Computers  1997-04-01