| Circulars Instructions | ||||||
| No. | Title | Date | Memo | Download | ||
| (2010 )circular No.36, Total No.36 | Notice on withdraw UR G3 rev.3& rev.3 Corr.1 | 2010-06-25 |
UR G3 (Rev 2 1997)CLN.pdf Notice on withdraw UR G3 rev.3& rev.3 Corr.1.pdf |
|||
| (2010)Circular No.26, Total No.26 | REVISED GUIDELINES ON IMPLEMENTATION OF EFFLUENT STANDARDS AND PERFORMANCE TESTS FOR SEWAGE TREATMENT PLANTS | 2010-05-21 |
CCS (2010)Circular No.26, Total No.26.pdf |
|||
| (2010)Circ. 22/Total No.22 | Notice on Implementation of Liquefied gas cargo and process piping Corr.1 | 2010-05-21 |
Notice on Implementation of “Liquefied gas cargo and process piping” Corr.1.pdf |
|||
| (2010)Circular No.13, Total No.13 | About PressureVacuum Valves and Flame Arrester Approval and Certificate | 2010-04-01 |
About PressureVacuum Valves and Flame Arrester Approval and Certificate.pdf |
|||
| list-20040927 | Circulars of Product Management Department of Industrial Division | 2004-09-27 |
list of Circulars 0409027(English).doc |
|||
| CCS Circ. NB No.007 | Technical Requirements and Compilation and Approval of the Supplementation to the Loading Manual of the Exiting Bulk Carriers | 1999-05-11 | ||||
| CCS Circ. NB No.006 | The Compilation of Evaluation Report and the Requirements of Safety Evaluation of Existing Bulk Carriers | 1999-04-01 | ||||
| CCS Circ. NB No.005 | Requirements for Approval of the Scheme of Corrosion Prevention for the Seawater Ballast Tanks of New Tankers and Bulk Carriers | 1998-10-21 | ||||
| CCS Circ. NB No.003 | Requirements for Approval and Survey of Loading Computers | 1997-04-01 | ||||